上海坤元新辰建设有限公司

Professional concrete conveying pipe factory, OEM supporting for construction machinery.

Concrete Pump Straight Pipe & Accessories Manufacturer

上海坤元新辰建设有限公司

Complete production management & quality assurance system for global construction machinery spare parts.

OEM Construction Machinery Concrete Pump Pipe & Fittings

image

About Us

Hongchang Machinery Technology Co., Ltd. in Ma'anshan City, Anhui Province is a high-tech enterprise specializing in the production and sales of high-maintenance concrete conveying pipes. The company's factory area is over 2,600 square meters. Our company has independent design and development capabilities for pumps and pipes, as well as complete production management systems, a sound quality assurance and marketing system. Each year, we produce 50,000 meters of "Hongchang" brand concrete pumping straight pipes and 15,000 pieces of curved pipes. Whether it is straight pipes or curved pipes, they are 2-3 times the lifespan of ordinary products.

Product Series

Pump Pipe Series

View All

Elbow Series

View All

Pipe Clamp Series

View All

Main Products

Why Choose Us?

OEM & OEM

OEM & OEM

Quality Control

Quality Control

Certifications

Certifications

Manufacturing

Manufacturing

News

The Pump Pipe RFQ Sheet: 12 Fields That Prevent a Wrong Order The single most common cause of pump pipe replacement errors is not poor welding or wrong material. It is an incomplete RFQ. A customer asks for “10 m suction pipe.” Without wall thickness, flange rating, or liquid temperature, the supplier quotes something — and the result is either a pipe that cannot handle pressure, a flange that leaks, or a delivery that arrives two weeks late. A well-designed pump pipe RFQ sheet removes this risk by forcing clarity before any quote is given. In pump system engineering, a structured RFQ sheet is the difference between a smooth install and a costly rework job. Below are the 12 fields every pump pipe RFQ sheet must contain. --- 1. Pipe Size and Schedule Start with nominal diameter. Specify DN (European) or NPS (American) as required — for example, DN100 or 4-inch. Equally important is the wall thickness schedule. Schedule 40 and Schedule 80 are common, but high-pressure systems may require Schedule 160. Never omit this. A DN100 Schedule 40 pipe and DN100 Schedule 80 pipe have the same bore name but completely different pressure capacity. --- 2. Material Grade Which metal is the pipe made of? Common choices include: · SS304 for general water and weak corrosive
The Pump Pipe RFQ Sheet: 12 Fields That Prevent a Wrong Order The single most common cause of pump pipe replacement errors is not poor welding or wrong material. It is an incomplete RFQ. A customer asks for “10 m suction pipe.” Without wall thickness, flange rating, or liquid temperature, the supplier quotes something — and the result is either a pipe that cannot handle pressure, a flange that leaks, or a delivery that arrives two weeks late. A well-designed pump pipe RFQ sheet removes this risk by forcing clarity before any quote is given. In pump system engineering, a structured RFQ sheet is the difference between a smooth install and a costly rework job. Below are the 12 fields every pump pipe RFQ sheet must contain. --- 1. Pipe Size and Schedule Start with nominal diameter. Specify DN (European) or NPS (American) as required — for example, DN100 or 4-inch. Equally important is the wall thickness schedule. Schedule 40 and Schedule 80 are common, but high-pressure systems may require Schedule 160. Never omit this. A DN100 Schedule 40 pipe and DN100 Schedule 80 pipe have the same bore name but completely different pressure capacity. --- 2. Material Grade Which metal is the pipe made of? Common choices include: · SS304 for general water and weak corrosive 2026-11-12 A DN125 pipe quotation that says only '3 metre, 500 pieces' leaves eight unknowns, and any one of them can stop the container from fitting. The twelve fields to send for straight pipe, elbows, reducers and clamps, with the measurements and documents that prevent a wrong order.
Concrete Pump Pipe Warranty: What Evidence You Need Before You Claim
Concrete Pump Pipe Warranty: What Evidence You Need Before You Claim 2026-11-12 **Pump Pipe Wear Guarantee** A pump pipe that fails early is only a claim if you can prove it. What a wear guarantee has to state in cubic metres, why goods-in wall thickness measurement decides the outcome, the evidence pack a manufacturer can actually process, and how a pro-rata credit is calculated.
How Many Concrete Pump Pipes Fit in a Container? Loading Maths and Freight per Metre
How Many Concrete Pump Pipes Fit in a Container? Loading Maths and Freight per Metre 2026-11-12 Freight per tonne obscures the real cost of moving pipe, since pipe is sold by the metre and shipped by the container. How container length and payload determine load quantity, why a 7 mm wall allows fewer metres than a 4.5 mm wall, and how to calculate freight cost per metre before comparing supplier quotations.
View all

Submit information